30-Inch Pipeline Replacement

Kinder Morgan | Port Arthur, Texas

Binkley & Barfield | DCCM replaced 8,000 linear feet of 30-inch natural gas pipeline in Jefferson County. Two 4,000 linear foot horizontal directional drills were used to relocate the proposed pipeline through the wetland and under three drainage canals. Close coordination took place with the U.S. Army Corps of Engineers and Jefferson County Drainage District No. 7 to minimize disturbance to the existing wetland and canals. Binkley & Barfield provided engineered plan and profile drawings, topographical survey, line verification, metes and bounds description for new easements, construction staking, as-built survey, and as-built plans.

Scroll to Top