Aerial Fiber Route Design Verification and Documentation

Harris, Fort Bend, Brazoria, Galveston, and Waller Counties, Texas

Binkley & Barfield | DCCM performed an aerial fiber route as-built field survey to verify that the fiber route was installed according to design at the correct attachment height. We obtained and documented the heights of all telecommunications cables and electrical conductors in a database spreadsheet. We analyzed the field data for compliance with the design. We created a pass/fail analysis indicating which fiber attachments complied with the design and the National Electrical Safety Code® clearance standards. Our team determined which fiber attachments failed and did not comply with the design and National Electrical Safety Code® clearance standards.

Scroll to Top